For the Government of Nepal project, IQUBX supplied and installed its WP01P partition system across approximately 5,000 sq. ft.

The project was completed in 2020, with Prem Chettri as the architect/interior designer and WBM as the PMC. The system used 12 mm prelam board panels and was supplied directly. The installation was completed in 20–25 days.

The project required a partition solution that could be installed without demolition or damage to the existing space, while maintaining a clean professional finish and providing flexibility for future changes.

Project at a glance

DetailsInformation
Client / End UserGovernment of Nepal
LocationNepal
SectorGovernment
Building TypeNot specified
Architect / Interior DesignerPrem Chettri
PMCWBM
IQUBX System InstalledWP01P
Panel MaterialPrelam Board
Panel Thickness12 mm
Area Installed5,000 sq. ft.
Completed2020
Installation Duration20–25 days
SupplyDirect

IQUBX Solution

Three priorities shaped the specification

Installation Without Demolition

The client required the new partition system to be installed without removing or damaging the existing walls or partitions. The solution helped avoid major civil work and minimize disruption to the existing space.

 

Fast & Clean Installation

The installation needed to be completed quickly with minimal site disturbance. The system was required to provide a neat, clean finish without visible nails or exposed fixings, creating a more professional and refined appearance.

Professional Finish with Future Flexibility

The client wanted a modular system that combined a premium finished appearance with the ability to dismantle, reconfigure or relocate partitions as future space requirements changed.

The finished space
Placeholder photography — swap in real site images when available

Outcome

The Government of Nepal project was completed using the IQUBX WP01P partition system, covering approximately 5,000 sq. ft. with 12 mm prelam board panels.

Completed in 20–25 days, the installation focused on minimizing disruption and avoiding demolition while delivering a clean, professional finish and maintaining flexibility for future dismantling, reconfiguration or relocation.