Hans Business Park​

Context and the brief

For client Dharamvir Yadav’s corporate office fit-out at Hans Business Park in Gurugram, IQUBX supplied and installed its WP03P and WP01P partition systems across roughly 2,500 sq ft, working alongside architect Ar. Prabhat Baghel and the Hans Business Park project management team.

The site was live during installation, so the work had to proceed without disrupting other ongoing activity — with a wood-grain finish, no visible nails or fixings, and a structure the client could dismantle and relocate later without touching the existing building fabric.

Project at a glance

DetailsInformation
ClientDharamvir Yadav
LocationGurugram, Sohna Road
SectorCorporate Office
Building TypeFit-out
ArchitectAr. Prabhat Baghel
PMCHans Business Park
System InstalledWP03P / WP01P
Completed2023

IQUBX Solution

Three priorities shaped the specification

Fast, non-disruptive installation

The client needed a fast installation process with minimal disruption to ongoing site activity — no visible nails or fixings, and a neat, professional finish throughout.

 

Acoustic performance & finish quality

The partition system had to provide good acoustic separation between rooms while delivering a clean, seamless, premium finish suited to a professional workplace.

Future flexibility & relocatability

A modular solution the client could dismantle and relocate later without major civil work or damage to the existing structure — flexibility for changing space needs.

The finished space
Placeholder photography — swap in real site images when available

Outcome

A full corporate fit-out delivered in 8–10 days on a live site, with a seamless wood-grain finish, no visible fixings, and a partition system Hans Business Park can dismantle and relocate whenever its space needs change.