Tech Mahindra, NSEZ- Slim Glass Partition Project

Context and the brief

For Tech Mahindra at NSEZ, Noida, IQUBX supplied and installed the GP2510 Glass Partition System across approximately 7,500 sq. ft. The commercial fit-out was completed in 2025, with Tata Projects as the main contractor.

The project required a slim partition series with a minimal floor footprint and clean joinery. The system also needed to be cost effective for the client, quick to install compared with other series, and able to accommodate doors and door frames.

Project at a glance

DetailsInformation
Client / End UserFateh Education
LocationPatel Nagar, Delhi
SectorEducation
Building TypeFit-Out
Architect / Interior DesignerSachin Sachdev
PMCVYOM
IQUBX System InstalledWP03P
Panel MaterialHDHMR Board
Panel Thickness12 mm
Area Installed2,000 sq. ft.
Completed2024
Installation Duration12–15 days
SupplyDirect

IQUBX Solution

Three priorities shaped the specification

Slim Profile, Smaller Footprint

The client wanted a slim series that takes up less floor space. GP2510 has an overall width of only 42 mm, which keeps the footprint on the floor small and maximizes usable area across the office.

Clean Joinery

The partition joinery was required to look neat and precise throughout. The system shows only 25 mm of profile from the front, giving a clean, sleek finish with the glass as the main visual feature.

Cost Saving and Fast Installation

The system offered cost savings on the client side. Its installation process is also faster than other IQUBX series, which helped the 7,500 sq. ft. project move efficiently on site.

Door and Door Frame Compatibility

GP2510 accommodates doors and door frames within the same system, so the partitions and entrances share a consistent, integrated look.

The finished space

Placeholder photography — swap in real site images when available

Outcome

The Tech Mahindra NSEZ project in Noida was completed using the IQUBX GP2510 Glass Partition System, covering approximately 7,500 sq. ft. with 10 mm toughened glass. Installed in 45-60 days, the solution met the project’s requirements for a slim 42 mm footprint, clean joinery with a 25 mm visible profile, cost savings, fast installation, and door and door frame integration.

The installation was completed in 12–15 days, delivering a clean and professional partitioned environment designed to accommodate changing electrical and data requirements, provide acoustic separation, and allow future dismantling or reconfiguration.