For client Dharamvir Yadav’s corporate office fit-out at Hans Business Park in Gurugram, IQUBX supplied and installed its WP03P and WP01P partition systems across roughly 2,500 sq ft, working alongside architect Ar. Prabhat Baghel and the Hans Business Park project management team.
The site was live during installation, so the work had to proceed without disrupting other ongoing activity — with a wood-grain finish, no visible nails or fixings, and a structure the client could dismantle and relocate later without touching the existing building fabric.
Project at a glance
| Details | Information |
|---|---|
| Client | Dharamvir Yadav |
| Location | Gurugram, Sohna Road |
| Sector | Corporate Office |
| Building Type | Fit-out |
| Architect | Ar. Prabhat Baghel |
| PMC | Hans Business Park |
| System Installed | WP03P / WP01P |
| Completed | 2023 |
Fast, non-disruptive installation
The client needed a fast installation process with minimal disruption to ongoing site activity — no visible nails or fixings, and a neat, professional finish throughout.
Acoustic performance & finish quality
The partition system had to provide good acoustic separation between rooms while delivering a clean, seamless, premium finish suited to a professional workplace.
Future flexibility & relocatability
A modular solution the client could dismantle and relocate later without major civil work or damage to the existing structure — flexibility for changing space needs.
Outcome
A full corporate fit-out delivered in 8–10 days on a live site, with a seamless wood-grain finish, no visible fixings, and a partition system Hans Business Park can dismantle and relocate whenever its space needs change.
iQubx Helps Businesses, Brands, And Professionals Connect, Grow, And Build Trust Through Powerful Listings, Smart Discovery, And Valuable Digital Opportunities.
© All rights reserved iqubx.com. developed by Post Dice